Project Description

100 Percent Bottling needed new lines to meet demand for their water bottle contracts with Coles and Woolworths. Their existing machinery was not working for them; they had daily breakdowns and stoppages to change bottle sizes.

 

Firstly, we worked with 100 Percent to design a new system that was intuitive to bottle sizes so that the system could keep running. Next, we designed and fabricated a control system for a new conveyor and airveyor lines.

 

Not only did 100 Percent Bottling increase production, they saved 4 hours per day in stoppages.

Project Details

Project size:

Project Link:

Critical Skills:

1,000,000

100% Bottling Company

Electrical Engineering, Disconnection, Fabrication, Installation, Materials Handling, Bottling, Hygienic environment, motor control, Variable Speed Drives, Conveyor systems